Altmar-Parish-Williamstown Central School District

  • Approximate Site Cost: $2.7 Million
  • Completed: Estimated 2012

Site work related to the District's consolidation of three existing elementary schools into one building on a former middle school. The construction also added a middle school component to the high school across the street. Assisted the architect... Read more »

Baldwinsville Central School District

  • Approximate Site Cost: $1.7 Million
  • Completed: Ongoing

Site work at 7 sites in the school district included: New all weather surface for existing 9 lane track and improvements to the grass fields and drainage on the football field.  Removal of the rubberized asphalt. Consultant responsible for... Read more »

Batavia Central School District

  • Completed: 2004

The first phase of the Capital Improvements project included the redesign of the track and sodfield with an irrigation system, baseball field and bleachers. The second phase was the design and construction of a courtyard with raised amphitheatre style... Read more »

Binghamton Central School District

  • Approximate Site Cost: Multiple Projects
  • Completed: 2009 - 2011

Phase 1C, completed in 2009 Retaining wall replacement at Franklin Elementary. Brick paver walk and courtyard replacement at the high school. Synthetic turf replacement on the roof of the high school parking garage deck. Landscape improvements.  Phase 2B,... Read more »

Broadalbin-Perth Central School District

  • Approximate Site Cost: $3.2 Million
  • Completed: 2006

Project included new bus loop, campus road renovation, water-storm-sanitary improvements and playscapes. Athletic improvements including bleachers and synthetic turf, bus garage access drive and extensive site work related to building additions. Storm water management improvements included coordinating a new storm water... Read more »

Camden Central School District

  • Approximate Site Cost: $3.1 Million
  • Completed: Ongoing

Site improvements at seven district school sites. Previous scope of work included an all weather 400 meter track, synthetic turf field and bleachers, multiple natural turf fields, playscapes, storm water management system, circulation/parking improvements. Current project includes parking improvements at... Read more »

Canandaigua Central School District

  • Approximate Site Cost: $2.3 Million
  • Completed: 2011

Site work at the middle school, primary/elementary school and academy. Scope of work includes pavement and walk replacement. Storm water management, including SPDES permit. Read more »

Chatham Central School District

  • Approximate Site Cost: $420,000
  • Completed: 2011

Site improvements at three schools. New entry drive and 13 car parking lot at elementary school with relocated playground. Asphalt access drive, truck turnaround, basketball court and drainage improvements at the middle school. Installation of a concrete walk... Read more »

Clyde-Savannah Central School District

  • Approximate Site Cost: $3.0 Million
  • Completed: Construction began in 2011

Drainage improvements, sidewalk and parking lot repairs. Athletic track with infield. New baseball field. Football field drainage improvements Courtyard design and playground updates.   Read more »

Delaware-Chenango-Madison-Otsego BOCES

  • Approximate Site Cost: $2.5 Million
  • Completed: 2008

Multiple phase construction on two separate building campuses. Chenango Campus: Performed site work to accommodate building additions. This included new parent-drop-off area, playscapes, retaining walls, basketball court, parking and pedestrian circulation, design and sanitary system upgrades. Portion of the project... Read more »

Edmeston Central School District

  • Approximate Site Cost: $2.5 Million
  • Completed: 2005

Utility infrastructure improvements including new sanitary service, athletic field improvements, pedestrian and vehicular circulation improvements, improved parking for buses and automobiles with the introduction of a front parent/student drop off. Design and other site work related to building renovations and... Read more »

Elmira Heights Central School District

  • Approximate Site Cost: $1.9 Million
  • Completed: 2002

Renovations at the high school and elementary/middle school. Project highlights at the high school included an synthetic turf football/soccer field, converting a 440 yard cinder track to a 400 meter track, parking and service area renovation, and pedestrian circulation.... Read more »

Enlarged City School District of Middletown

  • Approximate Site Cost: $7.0 Million
  • Completed: Estimated 2012

The building and majority of site components for the new  200,000 s.f. elementary School will need to be constructed on an existing elementary school site, which will be demolished after new building completion. The building and site project are... Read more »

Fort Plain Central School District

  • Approximate Site Cost: $4.2 Million total
  • Completed: Multi-Phase Project

Phase 1, completed in 2010 $3.9 million estimated site construction cost for site work at three school properties. Scope of services at Harry Hoag Elementary School included: site work surrounding the media center, improvements to the main entrance,... Read more »

Granville Central School District

  • Approximate Site Cost: $1.0 Million
  • Completed: 2010

Scope of services at the high school included: relocated athletic events (pole vault, long/triple jump, shot put and scoreboard), additional parking, addition of access roads, drainage improvements at the south parking lot, and site work related to the building... Read more »

Herkimer Central School District

  • Approximate Site Cost: $1.2 Million
  • Completed: 2009

Infrastructure improvements at both the elementary and high school sites. Soccer field drainage improvements at the elementary school. Replacement of failing sidwalks, a redesigned main entryway and a new playscape installation were also included at the elementary school. A... Read more »

Herkimer-Fulton-Hamilton-Otsego BOCES

  • Approximate Site Cost: Approximate Site Cost $2.0 Million
  • Completed: 2011

Improved pedestrian and vehicular/bus circulation including a new parking lot access drive and on-site bus queuing area. Campus road and parking lot renovations with improved drainage system. Installation of a new monument sign, including LED displays. Storm water management improvements. Read more »

Heuvelton Central School District

  • Approximate Site Cost: $1.0 Million
  • Completed: 2011

Site improvements included:   Parking and sidewalk improvements, separate bus and parent drop-off to avoid traffic and pedestrian conflict. Drainage improvements to the playing field and softball field renovations. Drainage improvements at the bus garage. Expanded and upgraded playground.... Read more »

Holland Patent Central School District

  • Approximate Site Cost: $820,000
  • Completed: 2005

Pedestrian and vehicular circulation improvements, improved parking for buses and automobiles with the introduction of a front bus loop at the middle school, playscapes at two elementary schools, design and other site work related to building renovations and additions.... Read more »

Honeoye Falls-Lima Central School District

  • Approximate Site Cost: Multi-phase Project
  • Completed: 2010-2012

Phase 1a, completed in 2010 $1.3 million estimated construction cost for turf replacement and track restoration. Scope of services included: removal of natural grass field and installation of artificial turf, remediation and resurfacing of the track, installation of a bleacher... Read more »

Hornell Central School District

  • Approximate Site Cost: $2.5 Million
  • Completed: 2003

Renovations at four separate school buildings. High school renovations included: Replacement  an existing sand based field with a synthetic turf field. Renovation of a 400m, 6 lane polyurethane track Installation of an automated sprinkler irrigation system for a baseball... Read more »

Ilion Central School District

  • Approximate Site Cost: $3.9 Million
  • Completed: 2011

Site work at three school properties. Scope of services at the high school included new football bleachers with press box, walkway improvements, new emergency access road with retaining wall, and storm water management improvements. Site work at Remington Elementary... Read more »

Indian River Central School District

  • Approximate Site Cost: $3.3 Million
  • Completed: 2010

The site work included seven project sites in the school district. Scope of work included site work associated with several additions, renovation of the existing track with new triple/long jumps and pole vault, new stairs and handicap accessible walks... Read more »

Laurens Central School District

  • Approximate Site Cost: $925,000
  • Completed: 2009

Utility infrastructure improvements including new sanitary service, pedestrian and vehicular circulation improvements, improved parking for buses and automobiles with the introduction of a front bus loop. Design and other site work related to building renovations and additions. Scope of services: SEQR,... Read more »

Liberty Central School District

  • Approximate Site Cost: $3.5 million
  • Completed: 2011

Includes site work at the elementary and high school properties. Developed numerous site configurations related to various building additions, and circulation needs to achieve program needs for the elementary school site. Scope of work at the elementary school includes... Read more »

Liverpool Central School District

  • Approximate Site Cost: $3.0 Million
  • Completed: Estimated 2012

Site work at the middle school and elementary school included: Improvements to vehicular and pedestrian circulation, providing a safe walkable environment for children.  Drainage improvements, significant storm water management system, working around the existing utilties. Renovation of a baseball field... Read more »

Lockport City School District

  • Approximate Site Cost: $1.0 Million
  • Completed: 2011

Scope of services included improved circulation including parent pick-up/drop-off areas, parking expansion, and site work surrounding three building additions. 125 vehicle parking expansion included drainage, walkways and curbing. Resurfacing of six tennis courts. Read more »

Lowville Academy and Central School

  • Approximate Site Cost: $5.5 Million
  • Completed: 2010

A new multi-purpose athletic stadium. New synthetic turf with inlaid lines for football, soccer, lacrosse, baseball and softball.  The athletic facility is surrounded by poured concrete retaining walls and padding on three sides of the facility. 1,000 seat bleachers.... Read more »

Marathon Central School District

  • Approximate Site Cost: $590,000
  • Completed: 2011

Site work at multiple school properties. Site work at the high school included reconstruction of the front courtyard and accessibility signage. Services at Appleby Elementary School included emergency generator screening, replacement of an existing parking lot and expansion of... Read more »

Marcellus Central School District

  • Approximate Site Cost: $250,000
  • Completed: 2011

Scope of site work included a new sidewalk connection from the parking area to the main entrance of the middle school, asphalt and drainage repairs near the bus maintenance building, new asphalt play area, and two new LED... Read more »

Mohawk Central School District

  • Approximate Site Cost: $3.7 Million total
  • Completed: Multi-Phase Project

Phase 1, completed in 2009 $3.4 million approximate site construction cost for site work at the elementary and Jr./Sr. High School. Scope of services at Fisher Elementary School included a new bus loop with access drive, new playground,... Read more »

Naples Central School District

  • Approximate Site Cost: $1.8 Million total
  • Completed: Multi-Phase Project

Phase 1a, completed in 2011 $591,000 estimated site construction cost for improvements at the elementary school. Installation of five new tennis courts. Relocation of an existing wooden playscape which was refinished with clear coating to ensure children's safety and... Read more »

New Hartford Central School District

  • Approximate Site Cost: $2.0 Million
  • Completed: 2009

Project included a new artificial turf and site improvements. The artificial turf included inlaid lines for football, soccer, lacrosse and hockey. Track resurfacing. Track and field event upgrades. Parking and traffic circulation improvements. Other site improvements associated with a building relocation... Read more »

North Rose-Wolcott Central School District

  • Approximate Site Cost: $800,000 total
  • Completed: 2011

Phase One, completed in 2010 $600,000 construction costs for site work related to three building additions at the high school Handicap parking signage, upgrades to the pedestrian walkways. Tennis court repairs at the middle school and two elementary schools.... Read more »

Oneida City School District

  • Approximate Site Cost: $4.0 Million
  • Completed: 2010

The 2009 Capital Improvements Project included miscellaneous site improvements and renovation of existing site facilities for 12 school properties. Athletic facilities improvements at the high school included new stadium complex, press box, tennis courts, track, and baseball field. Development... Read more »

Oneida City School / Oneida Transportation Center

  • Approximate Site Cost: $1.5 Million
  • Completed: 2006

A joint venture development project between the City of Oneida and Oneida City School District to create a new office park on a former City owned 40 acre abandoned dump site. Development of a bus maintenance facility and... Read more »

Oneida-Herkimer-Madison BOCES

  • Approximate Site Cost: $2.8 Million
  • Completed: 2010

Extensive site work for several building additions included: A new bus drop off, circulation and campus road renovations. Water-storm-sanitary improvements. Storm water management improvements included the development of three detention basins to meet NYSDEC requirements. Read more »

Oriskany Central School District

  • Approximate Site Cost: $900,000
  • Completed: 2006 - 2011

Site work relating to the renovations at 3 school sites included: Two new softball fields, parking areas and drainage improvements. High school site work included varsity baseball field with masonry dugouts, practice football field, expanded parking and vehicular/pedestrian circulation. An... Read more »

Oswego City School District

  • Approximate Site Cost: $1.4 Million total
  • Completed: Multi-Phase Project

Phase 1b, completed in 2009 $408,000 approximate site construction cost for improvements at two school sites. Scope of services at Oswego High School included installation of RPZ system at concession stand, addition of railings to existing staircase at gymnasium,... Read more »

Our Lady Of Mercy High School, Rochester, NY

  • Approximate Site Cost: $2.5 Million
  • Completed: Scheduled for completion in 2012

Coordination and agency approvals from the Town of Brighton Historic Preservation Commission, Conservation Board, Zoning Board of Appeals and the Planning Board. The newly designed athletic facility will include a new 400 meter resilient surface track, broken-back style with... Read more »

Penn Yan Central School District

  • Approximate Site Cost: $2.5 Million
  • Completed: 2010

Responsible for evaluating numerous site configurations related to various additions to achieve the best solution for the school district. Scope of site work included: A 400 meter all weather track, multiple grass playfields, synthetic turf playing field, circulation and... Read more »

Pocantico Hills Central School

  • Approximate Site Cost: $2.8 Million
  • Completed: 2011

AOLA worked with the Architect and Pool Consultant to redesign the pool complex. The existing pool was demolished, saving as much of the the stone veneer retaining walls as possible. Site worked included: Stone veneer retaining walls and... Read more »

Potsdam Central School District

  • Approximate Site Cost: $5.8 Million
  • Completed: 2009

Utility infrastructure improvements, relocation of an open stream corridor, pedestrian and vehicular circulation improvements, improved parking for buses and automobiles. Athletic improvement design and planning work included: synthetic turf multi-purpose field, 400 meter 6/8 lane resilient track and field events.... Read more »

Sandy Creek Central School District

  • Approximate Site Cost: $1.5 Million
  • Completed: 2005

Scope of services: Survey coordination and wetland evaluation, extensive onsite sanitary renovations, storm water management. Project highlights: New bus loop, multiple parking areas, creative arrangements of athletic facilities to minimize wetland disturbance, and multiple bleachers.   Read more »

Seneca Falls Central School District

  • Approximate Site Cost: $3.5 Million
  • Completed: Ongoing

Scope of work at three school sites includes: 8x8 all weather track with field events A grass playfield, synthetic turf field, softball field, scoreboards and bleachers Nature trail. Upgrading and rehabilitating existing site amenities with improved drainage and... Read more »

Sherburne-Earlville Central School District

  • Approximate Site Cost: $1.1 Million total
  • Completed: Multi-Phase Project

A continued relationship with the Sherburne-Earlville district from a project completed in 2006 awarded Appel Osborne the opportunity to provide services for another improvement project in 2008. Phase 1, completed in 2009 $767,000 estimated site construction cost for work... Read more »

South Lewis Central School District

  • Approximate Site Cost: $1.1 Million
  • Completed: 2011

Site work for four district properties including the high school. New building addition and related site work for a Biomass Boiler Plant Facility. Scope of services include grading and drainage improvements for extensive pavement restoration, soccer field reconstruction and... Read more »

Southern Cayuga Central School District

  • Approximate Site Cost: $2.0 Million
  • Completed: 2003

Scope of Services: Survey coordination, storm water management and erosion control measures. Athletic field improvements:  400 meter polyurethane track with bleachers, multiple natural turf competition fields renovations, tennis courts and baseball field. Parking and drive improvements, including the realignment of... Read more »

Spencer-Van-Etten Central School District

  • Approximate Site Cost: $1.3 Million
  • Completed: 2010

Scope of services included site improvements at the elementary, middle and high school. Parking and sidewalk improvements, including circulation improvements for the bus and parent drop-off to prevent future pedestrian/vehicular conflicts. Bus garage renovations, installation of a new... Read more »

St. Lawrence-Lewis BOCES

  • Approximate Site Cost: $300,000
  • Completed: Estimated Spring 2012

Renovation of an existing parking lot and the design of a new parking lot on the west side of the property to improve circulation and parking demand. The project required milling of the existing asphalt, pavements and reuse... Read more »

Syracuse City School District

  • Approximate Site Cost: $30 Million
  • Completed: Estimated 2012

Site work at both Syracuse ITC and HW Smith School, which is on an urban school site with limited space to work with. Site work includes:  Storm water management system to meet city requirements, including underground storage. Design... Read more »

Taconic Hills Central School District

  • Approximate Site Cost: $5.2 Million
  • Completed: Summer 2012

Athletic facility and infrastructure improvements. Reconstruction of jumping field events and resurfacing of 400 meter track. Installation of synthetic turf with inlaid lines for football, soccer and field hockey. Reconfiguration and construction of parking, and pedestrian and vehicular circulation routes.... Read more »

Victor Central School District

  • Approximate Site Cost: $4.4 Million
  • Completed: Multiple phases, ongoing

Utility infrastructure improvements, pedestrian and vehicular circulation improvements, landscape plantings and pavement renovation and new parking areas. Athletic improvements design and planning work includes: Synthetic turf multi-purpose field and resurface, 400 meter resilient track, field events and renovated tennis courts.... Read more »

Waterville Central School District

  • Approximate Site Cost: $1.2 Million
  • Completed: 2006 - 2010

Renovation of the schools existing athletic stadium including installation of a new synthetic turf field within their existing 6x6 lane running track, new track field events, resurfacing resilient track, 200 seat visitor bleachers and renovation of existing tennis courts. Additional... Read more »

Weedsport Central School District

  • Approximate Site Cost: $80,000
  • Completed: 2011

Site improvements at the high school. Scope of site work included the construction of code compliant stairs and an ADA accessible viewing platform at the athletic fields. Installation of bollard and gates to control site access. Read more »

West Genesee Central School District

  • Approximate Site Cost: $6.0 Million
  • Completed: 2008

Site design for multiple schools included new drives, parking, sidewalks and storm water management. Multiple athletic field renovations including a synthetic turf with inlaid lines for sports: football, soccer and lacrosse. New sodded practice field with irrigation system, as well... Read more »

Westhill Central School District

  • Approximate Site Cost: Multiple projects
  • Completed: 2008 - Present

Utility infrastructure improvements, storm water pump replacement, pedestrian and vehicular circulation improvements, improved parking for buses and automobiles. Estimated to begin construction in 2011 are site improvements at 4 separate school sites, including the reconfiguration of the district’s athletic facilities and the installation... Read more »

Westmoreland Central School District

  • Approximate Site Cost: $950,000
  • Completed: 2008

Scope of site work included a new sidewalk connection from the parking area to the track/concession plaza, a new 6x8 lane all weather track, replaced softball infield with new backstop, fencing and team dugouts, improved drainage, and a new... Read more »