Government/Public Institutions

Elmcrest Children's Center, Syracuse, NY

  • Approximate Site Cost: $570,000
  • Completed: 1980-2009

Various projects include the campus roadwork, sidewalks and landscaping, Athletic Recreation Center, and Maintenance Building. Individual sites involved steep grades/retaining walls, storm detention, and comprehensive planting analysis.  Elmcrest Spice Center (day care/education center) - responsible for on site storm water management with... Read more »

Geneva Town Hall, Geneva, NY

  • Approximate Site Cost: $400,000
  • Completed: 2000

The development of a master plan for a new Town Hall on a 22 acre parcel with the town hall on a 3 acre parcel. Design detailing and construction methodology customized to accommodate a large portion of the... Read more »

Onondaga County Courthouse, Syracuse, NY

  • Approximate Site Cost: $450,000
  • Completed: 2003

A new Court House design detailing and construction phasing on a tight urban site which has strong pedestrian and gathering spaces.  Site furniture includes pavers, ornamental railings, decorative bollards, lighting, benches, masonry screen walls, and attractive landscaping. The site design transitions... Read more »

Rockwell Musuem of Western Art, Corning, NY

  • Approximate Site Cost: $100,000
  • Completed: 2002

Site improvements at a museum in an urban commercial district. Scope of work included acquisition of adjacent property, site plan approval, demolition of an existing structure to create parking for 30 cars and miscellaneous site improvements Project highlights include... Read more »

St. Elizabeth Ann Seton Church, Clay, NY

  • Approximate Site Cost: $200,000.

Developed several plans for a new church, exploring the best location, relative to access, parking and pedestrian circulation. Scope of work included obtaining site plan approval on an environmentally sensitive site. Read more »

Swan Library, Albion, NY

  • Approximate Site Cost: $250,000
  • Completed: Estimated 2012

Construction of a new 15,000 s.f. library. Scope of work includes erosion control, site grading, extensive storm water management and drainage, asphalt pavement, site improvements, lawns and plantings. Read more »

Waterville Public Library, Waterville, NY

  • Approximate Site Cost: $300,000
  • Completed: 2006

Full design services for a new public library. Included SEQR documentation, site plan approval, and storm water management requirements under the SPDES GP-02-01 General Permit which included a storm water pollution and prevention plan to control storm water quantity and... Read more »

Williamson Town Complex, Williamson, NY

  • Approximate Site Cost: $400,000
  • Completed: 2005

The project included a new Town Complex which includes the Town Library, Courthouse and Town Offices. Responsible for developing several site schematics to assist architect in siting the building. Design includes grading, drainage and utilities (water and sanitary), new... Read more »