Athletic Complexes

Alliance Bank Stadium, Syracuse, NY

  • Approximate Site Cost: $830,000
  • Completed: 2008

Appel Osborne Landscape Architecture worked with Onondaga County to transform the Syracuse's AAA Baseball Franchise Stadium from an Artificial Turf Baseball Field to a Sand Based Natural Turf Baseball Field, saving as much of the existing infrastructure and stone... Read more »

Binghamton Central School District

  • Approximate Site Cost: $1.5 Million
  • Completed: 2011

Replacement of the existing artificial turf field. Resurfacing of the athletic track. Site work for new visitor field house building. Drainage improvements. Concrete and asphalt pavement restoration. Concrete stair replacement.   Read more »

Bradford Central School District

  • Approximate Site Cost: $912,000
  • Completed: 2008

A new artificial turf with inlaid lines for football and soccer. The existing track was resurfaced.   Read more »

Broadalbin-Perth Central School District

  • Approximate Site Cost: $3.2 Million
  • Completed: 2006

Project included new bus loop, campus road renovation, water-storm-sanitary improvements and playscapes. Athletic improvements including bleachers and synthetic turf, bus garage access drive and extensive site work related to building additions. Storm water management improvements included coordinating a new storm water... Read more »

Caledonia-Mumford Central School District

  • Approximate Site Cost: $2.5 Million
  • Completed: 2006

Site work included a high school track and field, pedestrian and vehicular circulation improvements, parking improvements, and other miscellaneous site work. Athletic field design and planning work included: Synthetic turf football/soccer field, 400 meter eight lane resilient surface broken back... Read more »

Camden Central School District

  • Approximate Site Cost: $3.1 Million
  • Completed: Ongoing

Site improvements at seven district school sites. Previous scope of work included an all weather 400 meter track, synthetic turf field and bleachers, multiple natural turf fields, playscapes, storm water management system, circulation/parking improvements. Current project includes parking improvements at... Read more »

Canisius College, Buffalo, NY

  • Approximate Site Cost: $1.4 Million
  • Completed: 2008

The project involves the replacement of a 122,500 s.f. Astroturf multi-purpose field that includes soccer, lacrosse, baseball and softball field overlays with an infill synthetic turf system. Design includes correcting field grading and drainage issues, improving baseball and softball dugout... Read more »

Carthage Central School District

  • Completed: 2008

Synthetic turf with inlaid lines for football, soccer, and lacrosse. Resurfacing of the existing track. Additional Bleachers were added to both ends of existing bleachers. Press box. Previous phases included site work for the grass fields including an irrigation... Read more »

Central Square Central School District

  • Approximate Site Cost: $3.0 Million
  • Completed: 2003

Project included a new synthetic turf football/soccer field, resilient surface track, bleachers, field events and various site improvements.   Read more »

Chenango Forks Central School District

  • Approximate Site Cost: $2.0 Million
  • Completed: 2008

Athletic facility renovation at the high school included a new synthetic turf field with multiple sports capability, new 2,000 seat aluminum fixed bleachers, newly rebuilt resilient surface, eight/six lane track, retaining walls at west side of the track and field,... Read more »

Cicero-North Syracuse Central School District

  • Approximate Site Cost: $1.5 Million
  • Completed: 2001

Renovations to the high school track and field. The athletic field design and planning work included a synthetic turf football/soccer field, 400 meter 6/8 lane latex track, field events, 1600 fixed seat bleachers, and drainage improvements. Pedestrian and vehicular... Read more »

Clyde-Savannah Central School District

  • Approximate Site Cost: $3.0 Million
  • Completed: Construction began in 2011

Drainage improvements, sidewalk and parking lot repairs. Athletic track with infield. New baseball field. Football field drainage improvements Courtyard design and playground updates.   Read more »

Delhi Central School District

  • Approximate Site Cost: $1.39 Million
  • Completed: 2004

Site work related to the additions and renovations to Delaware Academy High School. Scope of services included: New accessible walkway into the main entrance of the school, stair, pavement and patio renovations. Storm water management system improvements. Installation of... Read more »

East Syracuse-Minoa Central School District

  • Approximate Site Cost: $1.5 million
  • Completed: 2009

$1.5 million site construction cost for athletic complex renovation which included state-of-the-art multi-purpose synthetic turf field with improved drainage, field furnishings and protective netting. Extensive synthetic turf research and evaluation was also included, as well as stadium improvements that included... Read more »

Elmira Heights Central School District

  • Approximate Site Cost: $1.9 Million
  • Completed: 2002

Renovations at the high school and elementary/middle school. Project highlights at the high school included an synthetic turf football/soccer field, converting a 440 yard cinder track to a 400 meter track, parking and service area renovation, and pedestrian circulation.... Read more »

Enlarged City School District of Middletown

  • Approximate Site Cost: $5.0 Million
  • Completed: 2009

A new an all purpose athletic stadium that included spectator and athlete circulation around a new field house, concession area, and 3,500 seat bleacher facility. Site improvements also included retaining wall design, storm water management, high school cafeteria landscape... Read more »

Geneva Central School District

  • Approximate Site Cost: $1,025,000
  • Completed: Estimated Spring 2012

Site construction at the Gambee Road Athletic Fields Complex includes: Assisted the District in evaluating and re-configuring the existing fields to match the District’s current sports program requirements. Scope of work included: Survey, pedestrian circulation improvements, storm water management, athletic... Read more »

Glen Falls Central School District

  • Approximate Site Cost: $1.6 Million
  • Completed: 2008

The project included a new artificial turf with inlaid lines for sports: football, soccer, lacrosse and field hockey.   Read more »

Homer Central School District

  • Approximate Site Cost: $1.9 Million
  • Completed: 2005

A multi-sport athletic complex including a new synthetic turf playing field, 6/8 resilient surface track, field events, and new bleachers. Site improvements include improved baseball outfield, pedestrian walkways, bleacher underside storage, and a modular retaining wall.   Read more »

Honeoye Falls-Lima Central School District

  • Approximate Site Cost: $1.3 Million
  • Completed: 2010

Turf replacement and track restoration. Removal of natural grass field and installation of artificial turf. Remediation and resurfacing of the track. Installation of a bleacher wash down system allowing for hose connection at multiple points throughout the bleachers. Read more »

Hornell Central School District

  • Approximate Site Cost: $2.5 Million
  • Completed: 2003

Renovations at four separate school buildings. High school renovations included: Replacement  an existing sand based field with a synthetic turf field. Renovation of a 400m, 6 lane polyurethane track Installation of an automated sprinkler irrigation system for a baseball... Read more »

Le Moyne College, Syracuse, NY

  • Approximate Site Cost: $2.0 Million
  • Completed: 2010

A new all-weather infill turf complex as a practice and game field for the Division II National Championship Lacrosse team, as well as soccer and other campus sporting events. Responsible for the design and approval process for a state-of-the-art... Read more »

Liverpool Central School District

  • Approximate Site Cost: $4.8 million
  • Completed: 2010

Total renovation of existing athletic stadium complex including removal and replacement of a synthetic turf field, bleachers and 8x8 lane resilient surface track. A previously prepared master plan by AOLA and regular design development meetings proved useful in final... Read more »

Lowville Academy and Central School

  • Approximate Site Cost: $5.5 Million
  • Completed: 2010

A new multi-purpose athletic stadium. New synthetic turf with inlaid lines for football, soccer, lacrosse, baseball and softball.  The athletic facility is surrounded by poured concrete retaining walls and padding on three sides of the facility. 1,000 seat bleachers.... Read more »

New Hartford Central School District

  • Approximate Site Cost: $2.0 Million
  • Completed: 2009

Project included a new artificial turf and site improvements. The artificial turf included inlaid lines for football, soccer, lacrosse and hockey. Track resurfacing. Track and field event upgrades. Parking and traffic circulation improvements. Other site improvements associated with a building relocation... Read more »

North Collins Central School District

  • Approximate Site Cost: $2.8 Million
  • Completed: 2008

Design and planning work to create a multi-purpose synthetic turf field to be used for baseball, softball and soccer. Design also included custom dugouts, storm water management, parking reconfiguration and pedestrian circulation.   Read more »

Oneida City School District

  • Approximate Site Cost: $4.0 Million
  • Completed: 2010

The 2009 Capital Improvements Project included miscellaneous site improvements and renovation of existing site facilities for 12 school properties. Athletic facilities improvements at the high school included new stadium complex, press box, tennis courts, track, and baseball field. Development... Read more »

Oriskany Central School District

  • Approximate Site Cost: $900,000
  • Completed: 2006 - 2011

Site work relating to the renovations at 3 school sites included: Two new softball fields, parking areas and drainage improvements. High school site work included varsity baseball field with masonry dugouts, practice football field, expanded parking and vehicular/pedestrian circulation. An... Read more »

Our Lady Of Mercy High School, Rochester, NY

  • Approximate Site Cost: $2.5 Million
  • Completed: Scheduled for completion in 2012

Coordination and agency approvals from the Town of Brighton Historic Preservation Commission, Conservation Board, Zoning Board of Appeals and the Planning Board. The newly designed athletic facility will include a new 400 meter resilient surface track, broken-back style with... Read more »

Penn Yan Central School District

  • Approximate Site Cost: $2.5 Million
  • Completed: 2010

Responsible for evaluating numerous site configurations related to various additions to achieve the best solution for the school district. Scope of site work included: A 400 meter all weather track, multiple grass playfields, synthetic turf playing field, circulation and... Read more »

Perry Central School District

  • Approximate Site Cost: $2.5 Million
  • Completed: 2008

The project included a new artificial turf, track and site improvements. The artificial turf included inlaid lines for football and soccer. The renovations also included a 400 meter resilient surface track with jumping and throwing events. Bleachers for 1,000... Read more »

Potsdam Central School District

  • Approximate Site Cost: $5.8 Million
  • Completed: 2009

Utility infrastructure improvements, relocation of an open stream corridor, pedestrian and vehicular circulation improvements, improved parking for buses and automobiles. Athletic improvement design and planning work included: synthetic turf multi-purpose field, 400 meter 6/8 lane resilient track and field events.... Read more »

Rome Free Academy

  • Approximate Site Cost: $3.3 Million
  • Completed: 2005

High school track and field renovation design to optimize site utilization,. Prepared and presented a study identifying concept design alternatives, comparative life cycle costs and technical/product research. Scope of site design and planning work included: 400M, six/eight lane latex track,... Read more »

Schuylerville Central School District

  • Completed: 2010

Synthetic multi-purpose field inside an existing track with inlaid lines for football, soccer, lacrosse, and field hockey. The design also included a new pressbox and scoreboard, and new field events at north and west end of track.   Read more »

Seneca Falls Central School District

  • Approximate Site Cost: $3.5 Million
  • Completed: Ongoing

Scope of work at three school sites includes: 8x8 all weather track with field events A grass playfield, synthetic turf field, softball field, scoreboards and bleachers Nature trail. Upgrading and rehabilitating existing site amenities with improved drainage and... Read more »

Southern Cayuga Central School District

  • Approximate Site Cost: $2.0 Million
  • Completed: 2003

Scope of Services: Survey coordination, storm water management and erosion control measures. Athletic field improvements:  400 meter polyurethane track with bleachers, multiple natural turf competition fields renovations, tennis courts and baseball field. Parking and drive improvements, including the realignment of... Read more »

Victor Central School District

  • Approximate Site Cost: $4.4 Million
  • Completed: Multiple phases, ongoing

Utility infrastructure improvements, pedestrian and vehicular circulation improvements, landscape plantings and pavement renovation and new parking areas. Athletic improvements design and planning work includes: Synthetic turf multi-purpose field and resurface, 400 meter resilient track, field events and renovated tennis courts.... Read more »

Waterville Central School District

  • Approximate Site Cost: $1.2 Million
  • Completed: 2006 - 2010

Renovation of the schools existing athletic stadium including installation of a new synthetic turf field within their existing 6x6 lane running track, new track field events, resurfacing resilient track, 200 seat visitor bleachers and renovation of existing tennis courts. Additional... Read more »

Westhill Central School District

  • Approximate Site Cost: Multiple projects
  • Completed: 2008 - Present

Utility infrastructure improvements, storm water pump replacement, pedestrian and vehicular circulation improvements, improved parking for buses and automobiles. Estimated to begin construction in 2011 are site improvements at 4 separate school sites, including the reconfiguration of the district’s athletic facilities and the installation... Read more »

Westmoreland Central School District

  • Approximate Site Cost: $950,000
  • Completed: 2008

Scope of site work included a new sidewalk connection from the parking area to the track/concession plaza, a new 6x8 lane all weather track, replaced softball infield with new backstop, fencing and team dugouts, improved drainage, and a new... Read more »