Honeoye Falls-Lima Central School District

Approximate Site Cost: $1.3 Million Completed: 2010
  • Turf replacement and track restoration.
  • Removal of natural grass field and installation of artificial turf.
  • Remediation and resurfacing of the track.
  • Installation of a bleacher wash down system allowing for hose connection at multiple points throughout the bleachers.