- Scope of services: Survey coordination, storm water management and erosion control measures.
- Athletic field improvements: 400 meter polyurethane track with bleachers, multiple natural turf competition fields, tennis courts and baseball field.
- Parking and drive improvements, including the realignment of the roadways, parking and improved circulation.
- Significant drainage modifications.
- A well was designed to help with irrigation.
- Previous site work in phase one related to the building addition and also included storm water management system, sanitary and septic, as well as parking improvements.
- Project was completed in 2003.
Appel Osborne was given the opportunity to assist with another project at this district.
- $1.3 million approximate site construction costs.
- Parking lot renovations including new asphalt, curbs, sidewalk and entry plaza. Provide drainage improvements and improved circulation upgrades in the parking lot.
- Resurface running track.
- Dredge the detention basin and drainage ditches.
- Seal and restripe the Jr./Sr. High School parking lot.
- Replace maintenance drive.
- Prepare Storm Water Pollution Prevention Plan (SWPPP) and State Pollutant Discharge Elimination System (SPDES Permit).
- Project was completed in 2016.