Phase One
- 8x8 lane all-weather track and field events.
- Vertically draining natural grass soccer field.
- Press box and 800+/- seat bleachers.
- New 50 car parking lot.
- Rebuilding of six tennis courts.
- Perimeter access drive and perimeter fencing.
- Overseeding of existing baseball field.
- Utilities design including storm water management system.
Phase Two
- Redesign of middle school entry plaza and adjacent walkways.
- Redesign of two high school entry plazas and adjacent walkways.