- Renovation of the entire parking facilities including pavement replacement, circulation improvements, bus parking, new curbs and sidewalks. Creation of a designated bus loading zone, safely separating bus, car and student conflicts.
- Replaced deteriorated front entry steps at the original school building and incorporated an accessible ramp and ornamental handrails.
- Drainage improvements implemented to meet current NYSDEC code compliance.
2018 Capital Improvement Project
- New 6-lane track and field events, new multipurpose natural grass field within the track, new 200-seat bleachers.
- Design of stadium entrance and pedestrian walkways.
- Drainage improvements at athletic field including new underdrain system.
- Parking expansion and site work related to new storage building.
- Storm water management.