- $1.39 million approximate site construction costs for additions and renovations to Delaware Academy High School.
- Scope of services included:
- New accessible walkway into the main entrance of the school.
- Stair, pavement and patio renovations.
- Storm system repair.
- Installation of a new resilient surface track (6 lane/8 lane straight)
- Project was completed in 2004.
- Additional work at the Delaware Academy was completed in 2011.
- Scope of work included contract documents related to the removal of the existing bluestone patio in front of the building, which was replaced with textured concrete.
A continued professional relationship with the district allowed Appel Osborne the opportunity to assist with another site improvement project.
- $1.0 million approximate site construction costs.
- Paving replacement for bus and vehicular parking and drive lanes.
- Pedestrian circulation upgrades.
- Drainage improvements.
- Track resurfacing.
- Other Building Condition Survey items.
- Project was completed in 2014.