2001 Site Improvements

  • Design included master plan update including vehicular and pedestrian circulation, parking, utilities, and alternate building locations for future expansion.
  • Responsible for developing construction documents for locating a new classroom, auditorium, and technology building including development of various pedestrian site amenities, plazas, parking areas, planting and storm water management improvements.
  • Developed a main entrance drive and vehicle circulation plan to create new arrival experience to the campus and improve the visual sequence from Memorial Parkway.
  • Previous work included evaluation of the existing track facility.  AOLA recommended development options for renovation and conversion of the 440 yard track to a 400 meter all-weather urethane track NCAA regulated facility. The project included the development of construction documents and assisted in the project construction administration during installation.

Wayfinding Signage | Utica, NY and Rome, NY campuses, Completed in 2015

  • Design services for exterior wayfinding signage and design guidelines for future construction, renovation and sign replacement.
  • Developed schematic design options, templates, material selection and usage guidelines for exterior signs.
  • Provided photo simulations illustrating sign templates in proposed campus locations.
  • Prepare "updateable" campus map for wayfinding.
  • Developed vehicular and parking and pedestrian wayfinding templates, including mapping.
  • Developed temporary mobile signage templates for special events.
  • Reviewed existing regulatory signage and developed guidelines for traffic control and uniform traffic control compliance.
  • Developed written report and necessary graphics and/or photo documentation and recommendations.
  • Prepared cost estimates for various sign templates and related site improvements.

Sidewalk Renovation, completed in 2018

  • Renovations at the dormitories and improvements to the residential quad.
  • Sidewalks were replaced and widened to accommodate fire truck access.
  • Correction of drainage issues in the quad.
  • New sidewalks were designed to mimic the original score pattern of the 1965 design.