Higher Education
Onondaga Community College
Syracuse, NY
Athletic Facilities Master Plan
In 2004, a review of limitations to indoor and outdoor athletic facilities
in and the desire for campus improvements prompted Onondaga Community
College to investigate short and long term solutions for an athletic
facilities master plan. Appel Osborne Landscape Architecture coordinated
an approach that included an inventory of existing campus conditions,
ongoing dialog and consensus building among stakeholders, confirmation
of athletic program requirements, and review of various design options
was incorporated to capture the overall vision.
A series of approved design guidelines became the basis for preparing two
different conceptual design options for consideration. Each option
included phasing approaches and cost estimates.
Syracuse University
Syracuse, NY
Chancellor's Residence - Comstock Ave. Retaining Wall
$500,000. approximate site cost.
Replacement of brick and block cantilevered wall and limestone gravity wall surrounding the Chancellor's residence. Development of massive screening buffers to mitigate the removed vegetative hedgerow.
Special site improvements include attractive security lighting, marble stepping stone pathway, and marble/concrete bench from salvaged materials.
Project completed 1997.
SUNY Brockport
Brockport, NY
Student Apartments
Created landscape planting plan for 200 bed student apartment complex.
Produced design development and contract documents of the landscape planting
plan, details and technical specifications for the entire project.
Assisted with the design development sketches of hardscape and site elements.
SUNY Cortland
Cortland, NY
New Residence Hall
- $300,000. approximate site cost
- Full design services for a new residence hall and related pedestrian/vehicular modifications.
- Design includes new courtyard area and plantings. LEEDS certified and SPDES 2 requirements.
- Project is scheduled for completion 2005.
Le Moyne College
Syracuse, NY
East Campus Improvements
- $100,000. approximate site cost
- Full design services through contract administration for a new paver walkway system which connects the east campus to the main campus circulation system.
- Project completed 1993.
SUNY Oneonta
Oneonta, NY
Rehabilitation of Fine Arts Building
- $150,000. approximate site cost
- Responsible for design and preparation of construction documents for the rehabilitation of an existing courtyard space.
- Design included a performance stage area, courtyard amenities, plantings and irrigation system.
- Project is scheduled for completion 2004.
SUNY Oneonta
Oneonta, NY
- $10,000. estimated site cost
- Design of wood planter and miscellaneous site improvements associated with the construction of a new utility tunnel in an existing pedestrian mall.
- Design completed Spring 1998.
Mohawk Valley Community College
Utica, NY
- $2,000,000. approximate site cost
- Design includes master plan update including vehicular and pedestrian circulation, parking, utilities, and alternate building locations for future expansion.
- Responsible for developing construction documents for locating a new classroom, auditorium, and technology building including development of various pedestrian site amenities, plazas, parking areas, planting and storm water management improvements.
- Developed a main entrance drive and vehicle circulation plan to create new arrival experience to the campus and improve the visual sequence from Memorial Parkway.
- Project completed 2001.
University of Rochester
Rochester, NY
River Campus Parking Expansion
- $200,000. - $500,000 approximate site costs. Multiple projects
- Development and expansion of multiple parking areas including site plan approval with the City of Rochester and storm water management mitigation.
- The project included preparation of various space programming options and phasing scenarios.
- Project ongoing. Current project completed 2003.
SUNY IT / Utica
Utica, NY
Renovation of Kunsela Hall
- $100,000. approximate site cost
- Addition and renovation of the former library wing to accommodate the School of Nursing and the School of Management
- Design Highlights included the creation of a new entrance and landscaping to enhance the entry and access to adjacent parking facilities.
- Project scheduled for completion 2004.
SUNY Oswego
Oswego, NY
Lakeside Complex
- $500,000 approximate site cost
- Development of a phased capital improvements program for rehabilitation of a five building campus residential complex.
- Design includes entry statement and service access for each building.
- Special features include: Signage, seating walls, pavers, ornamental plantings, benches and lighting.
- Provided computer simulations to assist the Campus Environmental Committee in design review.
- Project completed 1992.
Elmira College
Elmira, NY
Domes Athletic Complex
- $150,000. approximate site cost.
- Addition and renovation project to create a new locker room facility and team arrival area for the ice arena.
- Site design highlights included development of a new bus arrival area, parking, and service access.
- Project completed 2000.
Hamilton College
Clinton, NY
- $350,000. approximate site cost.
- Conducted a feasibility study for improvements and expansion of Dunham Hall Dormitory parking.
- Evaluated storm drainage system, parking and expansion needs and ADA compliance.
- Developed program needs and cost estimates for various development options.
- Developed and detailed new campus entrance sign including photo simulations, design options and local planning board approvals.
- Project completed Spring 2002.
Hamilton College
Clinton, NY
Rogers Campus Drive
- $175,000. approximate site cost
- Development of a 1/4 mile drive to link a newly acquired dormitory to the main campus. The access drive traverses a steeply sloping, wooded site which crosses over several drainage ravines.
- Compatibility with topography and storm drainage, safe walkable slopes, good visibility and night-time lighting were important program requirements.
- Project completed 1995.
SUNY Brockport
Brockport, NY
Hartwell Hall / Pedestrian Mall
- $780,000. approximate site cost.
- Full design services include extending the central pedestrian mall, creating two new plazas and designing site amenities for the mall.
- Project completed 1999.
Utica College
Utica, NY
Residence Hall and Conference Center
- $800,000 approximate site cost.
- Design includes an outdoor pedestrian plaza which serves as an extension of the conference center and campus activities.
- Developed a traffic circle and drop-off area for residents and visitors.
- Expansion of the parking facility by 125 cars with designated handicap parking was also included.
- Special features include: Seating walls, lighting, pavers, special planting and ornamental fencing.
- Project completed 1999.
State University College of Agriculture and Technology
Morrisvillle, NY
- $30,000. approximate site cost
- Developed pedestrian linkage from upper Administration Building to the lower Student Center
- Project completed 1998.
State University College of Agriculture and Technology
Morrisvillle, NY
- $100,000. approximate site cost
- Responsible for the design of a new courtyard and adjacent facilities to an addition of the Spader Hall Greenhouse.
- Project included seating walls and handicap accessibility improvements.
- Project completed 2001.
Cornell University
Ithaca, NY
Cornell University Track
- $1.2 million approximate site cost
- Development of an 8 lane 400 meter all weather urethane track, shot put, triple and long jump, pole vault, discus, hammer throw, javelin, soccer field, relocated pedestrian mall and donor recognition area.
- Project completed Fall 1996.
Syracuse University
Syracuse, NY
University College Building
- $120,000 project site cost.
- Responsible for developing a handicap accessible main entrance in harmony with the architectural style in a tight urban space. Stairs, ramps and walkways work consistently with building details.
- Project completed 1998.
Le Moyne College
Syracuse, NY
College Master Plan
- Prepared an AutoCAD base map of the campus based on existing maps, site visits, and aerial photographs.
- Prepared site analysis (written text and maps) on land forms/slopes, soils, views and vistas, vegetation, open spaces, parking, vehicular and pedestrian circulation, storm drainage, and site amenities.
- Prepared a site development plan with estimated costs based on short term (0-3) and long term goals.
- Project completed 2003.